Water Resources Center
OSTP

The Water Resources Center is affiliated with the College of Food, Agricultural and Natural Resource Sciences and University of Minnesota Extension.

Procedure for Determining Plastic Limit

Printer-friendly version (.pdf)

Definitions

Plastic Limit (PL or wP) – The minimum water content at which the mixture acts a plastic solid. More information can be found in the Manual for SSTS Professionals in Minnesota, Section 3 - Sewage Treatment Utilizing Soil.

Step-by-Step Instructions

Procedure for Determining Plastic Limit in the Field:

  1. Select a handful of soil for testing (any non-soil material (rocks, roots, etc.) should be removed). Do not add moisture or let dry-out. Sample should be taken at the depth of excavation (absorption area).
  2. Roll the sample between the palms (in the shape of a pencil/worm shape).
  3. Continue rolling the thread until it reaches a uniform diameter of 1/8 inch if possible (See Figures 3.23 and 3.24).
  4. If the sample does not reach a diameter of 1/8 inch, the soil is above the plastic limit and construction can proceed.
  5. If the sample is rolled into a diameter equal to 1/8 inch before breaking, the soil is too wet and construction should not occur.

Figure 3.23 Roll Sample Between the Palms

OSTP-professional-soils-figure3.23-pic

Figure 3.24 Field Determination of Plastic Limit


OSTP-professional-soils-figure3.24-pic